With the ground dry enough for concrete work, crews are making progress on the second phase of this summer's project to reconstruct Union Drive between Welch and Bissell roads. A team (pictured) works south of Student Services Building to prepare a new driveway off Union Drive that will service lot 5 south of that building and lot 65 south of the Enrollment Services Building. Friley Residence Hall is in the background.