This is an archived story. The content, links and information may have changed since the publication date.

All Articles

Must love heights

Jib on tower crane rises above Marston water tower

Photo by Christopher Gannon.

On the heels of a partially washed-out weekend, a crew still was installing a tower crane Monday at the Student Innovation Center construction site on the west side of campus. The operator cab near the top rises above the 168-foot Marston water tower next door, which will mean quite a daily climb for its occupant. Work on the Student Innovation Center will continue into the early part of spring semester 2020.