Must love heights

Jib on tower crane rises above Marston water tower

Photo by Christopher Gannon.

On the heels of a partially washed-out weekend, a crew still was installing a tower crane Monday at the Student Innovation Center construction site on the west side of campus. The operator cab near the top rises above the 168-foot Marston water tower next door, which will mean quite a daily climb for its occupant. Work on the Student Innovation Center will continue into the early part of spring semester 2020.